Ateliers Jean Nouvel has released construction photos of the Shenzhen Opera House, which is due for completion in 2028. The building sits on the Shekou Peninsula, overlooking Shenzhen Bay.
The finished building will have an elongated, wavy roofline. The studio designed that curve to echo the site’s direct link to the sea.
Scale and program
Pritzker Prize winner Jean Nouvel designed the complex as a new cultural landmark for the city. It covers 250,000 square metres along the waterfront.
The venue includes a 2,300-seat concert hall, an 1,800-seat theatre and an 800-seat venue. A multifunctional theatre with 400 seats will also be included.
For another example of a cultural building reshaped for music and performance, see how a historic Houston coffee plant became a music and arts academy while keeping its industrial character.

Other facilities include cultural spaces, backstage areas, offices and apartments for performers.
The recent photos show the main concert hall, which has a horseshoe-shaped plan. They also show the two smaller performance venues.

A competition win
The studio won an invited international architecture competition for the project. BIG, Snøhetta, MVRDV and Kengo Kuma also took part.
Kuma’s competition rivals also worked on waterfront sites, and his brick towers wrapping open-air pools on Copenhagen’s Papirøen harbour show how a shoreline project can be shaped around water.
Materials and the sea
The interior is expected to use iridescent materials such as mother-of-pearl, known as nacre. The studio plans these surfaces to reflect light and help tie the building to the water around it.
In 2021, when the design was revealed, Nouvel described the link between building and bay in direct terms. “The sea will be both around you and over you,” he said.

Nouvel has also said the main foyer needs a luminous, precious material that brings together the sea, music and light. He presented the nacre surfaces as the way to make that meeting visible inside the building.
shenzhen opera house background
Jean Nouvel’s studio was founded in 1994 and has worked on major cultural buildings around the world. The Shenzhen project adds a large waterfront venue with distinctive opera house architecture to that record, with completion scheduled for 2028.

Via dezeen.com
Frequently asked questions
When is the Shenzhen Opera House scheduled to be completed?
The Shenzhen Opera House, designed by Ateliers Jean Nouvel, is due for completion in 2028. Construction photos of the building were recently released by the studio.
Where is the Shenzhen Opera House being built?
The Shenzhen Opera House sits on the Shekou Peninsula and overlooks Shenzhen Bay. The site has a direct link to the sea, which influenced the building’s design.
What performance venues will the Shenzhen Opera House include?
The complex will include a 2,300-seat concert hall, an 1,800-seat theatre, and an 800-seat venue. It will also have a 400-seat multifunctional theatre.
Why does the Shenzhen Opera House have a wavy roofline?
The elongated, wavy roofline was designed to echo the site’s direct link to the sea. The curve reflects the building’s waterfront location on Shenzhen Bay.
More in
Architecture
All Architecture



More like this

Revolutionary Tortoiseshell Smart Glasses by Even Realities Marries Style with Tech

Vibrant Geometry: MVRDV's Layered Vision for Shenzhen's Bihailou Art Village

Apple Unveils Intimate 600-Seat Concert Hall Inside London's Iconic Battersea Power Station

Powerhouse Parramatta Opens Its Steel Lattice to Visitors With Devlin and Turrell Art

Shenzhen's Vast New Museum Melds Bold Architecture with a Walkable Granite Landscape
